Projects

91 Cr

Jharkhand - MRR

Executed a large-scale, multi-district land and revenue records modernization program for Jharkhand’s Revenue Department, transforming legacy paper-based record rooms into a centralized, secure, and auditable digital ecosystem. Scope covered end-to-end digitization, civil and interior upgrades, modular compactor installation, secure data-center infrastructure, and deployment of an enterprise-grade Document Management System enabling workflow automation, version control, role-based access, and advanced search and retrieval across more than twenty districts.

110 Cr

Himachal Pradesh – BharatNet

Executed large-scale aerial and underground OFC deployment across multiple zones in Himachal Pradesh, establishing resilient ring architecture connectivity to Gram Panchayats and blocks. Scope covered armored underground trenching, HDD through difficult terrain, HDPE duct laying, ADSS aerial stringing, fiber jointing, route marking, OTDR testing, router installation, fiber termination, power systems with battery backup, earthing, and end-to-end integration testing. The project includes multi-year post-commissioning O&M with rapid fault restoration SLAs, forming a critical digital backbone for reliable last-mile connectivity in challenging terrain.

240 Cr

Bihar - ICT Labs

Served as the Service Implementation Partner for statewide ICT enablement across government schools and KGBVs in Bihar under the Samagra Shiksha framework, managing 3,800 resources across ICT labs. Scope covered hardware deployment, LAN and power infrastructure, internet connectivity, and large-scale manpower operations, including recruitment, training, and deployment of instructors. Amilionn also managed payroll, EPF/ESI compliance, helpdesk operations, and ongoing support, ensuring consistent digital education delivery across a large public education footprint.

120 Cr

Andhra Pradesh – Excise Department

Designed, implemented, and operates Andhra Pradesh’s statewide Integrated Excise Management and Track-and-Trace platform under a BOOT model, enabling end-to-end digital oversight across the liquor supply chain, including excise offices, production units, depots, enforcement teams, citizen verification systems, and 4,500 retail outlets. The platform includes GS1-standard 2D barcode serialization, real-time production and inventory monitoring, online and offline retail billing, Tier-III Data Centre hosting, and 24×7 managed operations with 99.9% uptime.

245 Cr

Chhattisgarh - WIA

Executed a large-scale water infrastructure automation program in Khudiya District, Chhattisgarh, covering reliable drinking water supply across 200+ villages. Scope included design, construction, testing, and commissioning of floating pontoons, raw water pumping stations, 200 kVA electrical substations, a 23 MLD water treatment plant, gravity and clear water mains, balancing reservoirs, zonal reservoirs, and allied civil works. Delivered as mission-critical rural public infrastructure, integrating engineering, automation, and execution to support dependable water access across a wide rural footprint.

90 Cr

West Bengal - BharatNet

Executed the design, deployment, testing, commissioning, and long-term O&M of a large-scale BharatNet broadband network rollout across multiple districts in West Bengal. Scope included underground and aerial OFC deployment through trenching, HDD, pole erection, cable laying and splicing, FDMS infrastructure, joint enclosures, termination units, GIS-based fiber asset and inventory management, OTDR testing, and mobile-based monitoring. Delivered with strict SLA compliance, safety standards, and preventive maintenance regimes, forming a critical digital backbone for resilient last-mile connectivity across the state.

160 Cr

Maharajgunj – WIA

Executed large-scale rural water supply infrastructure projects across MaharajGunj District, Uttar Pradesh, under a comprehensive EPC and ten-year O&M framework. Scope covered survey, DPR preparation, construction, and commissioning of integrated water systems, including tube wells, intake structures, WTPs, rising and pressure mains, clear water reservoirs, overhead tanks, distribution networks, household connections, and public standposts. Delivered across multiple habitations, the program strengthens sustainable and reliable drinking water access while ensuring long-term operational readiness.

120 Cr

Khaga – WIA

Executed large-scale rural water supply infrastructure projects across Khaga under a comprehensive EPC and ten-year O&M framework. Scope covered survey, DPR preparation, construction, and commissioning of integrated water systems, including tube wells, intake structures, WTPs, rising and pressure mains, clear water reservoirs, overhead tanks, distribution networks, household connections, and public standposts. Delivered across multiple habitations, the program strengthens sustainable and reliable drinking water access while ensuring long-term operational readiness.

50 Cr

Manipur - BharatNet Phase III (OFC Network Deployment)

Executing large-scale optical fiber infrastructure deployment under the BharatNet Phase III program in Manipur, in collaboration with ITI Limited. The project involves end-to-end implementation of underground and aerial OFC networks to enable high-speed broadband connectivity across Gram Panchayats and block-level nodes. Scope includes route survey, right-of-way facilitation, fiber laying, installation, integration, testing, and commissioning of network infrastructure, along with ring topology architecture for enhanced reliability. Designed for remote and challenging terrain, the program strengthens rural connectivity, supports digital inclusion, and enables delivery of eGovernance services across the region.

55 Cr

Andhra Pradesh - APFSL

Executed a large-scale BharatNet broadband network rollout across Kurnool District, strengthening last-mile digital connectivity and core telecom infrastructure for public service delivery. The project supported high-speed broadband access across underserved areas, enabling more reliable connectivity for government institutions, local communities, and eGovernance service delivery.

< 50 Cr

Dholpur - WIA

Delivered advanced PLC-SCADA automation for the Dholpur Lift Irrigation and Drinking Water Project, drawing raw water from the Chambal River. Executed under an EPC model with long-term O&M, the scope included redundant control systems across intake stations and reservoirs, instrumentation, hydraulic systems, dual communication networks, weather and soil-moisture stations, and seamless integration with substations. The project was commissioned within six months, strengthening reliable monitoring and control for critical water infrastructure.

< 50 Cr

Proddutur - WIA

Delivered end-to-end automation for the 43 MLD Proddutur Water Supply Scheme, covering design, engineering, supply, installation, and commissioning of the OSSADA system. The platform enables real-time operational control, data acquisition, centralized monitoring, and improved visibility across water treatment and distribution processes, supporting reliable management of critical urban water infrastructure.

< 50 Cr

Arunachal - Urban Development

Established a dedicated State Data Center for Arunachal Pradesh’s Urban Development Department, creating secure, centralized, and scalable digital infrastructure to support statewide urban governance operations. The platform strengthens data hosting, application availability, departmental workflows, and reliable service delivery across urban development functions.

< 50 Cr

Andhra Pradesh - GIS

Delivered drone-based GIS surveying for Andhra Pradesh’s Urban Development Department, enabling accurate spatial mapping, high-resolution land and asset data capture, and improved visibility across key development areas. The initiative supports data-led urban planning, infrastructure assessment, project monitoring, and more informed decision-making for urban development operations.

< 50 Cr

Kaleshwaram - WIA

Delivered advanced PLC-SCADA systems and instrumentation for large-scale irrigation infrastructure under the Kaleshwaram program. Scope covered automation of pumping stations, reservoirs, and associated water assets, enabling real-time monitoring, centralized control, operational visibility, and seamless integration with field instruments. The system was designed for high availability and redundancy, supporting mission-mode irrigation operations across critical water infrastructure.

< 50 Cr

Ganjam - WIA

Delivered end-to-end automation for the Ganjam Water Supply Scheme, covering design, engineering, supply, installation, and commissioning of the OSSADA system. The platform enables real-time operational control, data acquisition, centralized monitoring, and improved visibility across water treatment and distribution processes, supporting reliable management of critical urban water infrastructure.